Concentrate on quality of the construction hoist and suspended platform, never forget original intention!

KNOWLEDGE

Home  > ABOUT US  > KNOWLEDGE  > 

Installation requirements of aluminum alloy zlp630 construction cradle

Installation requirements of aluminum alloy zlp630 construction cradle

2021-07-08

1.      The electric motor hoist Zlp630 must be installed by professional staff.

         The working staff in the hanging platform can not exceed two people.

         All workers should take protection measures, and access the platform from the ground.

2.      The construction cradle should be acceptance after installation.

3.      Inspection before and after daily work is very necessary.

       Take record after technical disclosure.

4.      The protective barriers should meet the safety requirements

5.      Take measures to avoid the construction lifting cradle from swaying. The distance between the aluminum alloy hanging gondola and the working face should be within the scope of the requirements.

6.      Overload is strictly prohibited, and the loading material in the working stage should be evenly stacked.


Chat Online 编辑模式下无法使用
Chat Online inputting...