Concentrate on quality of the construction hoist and suspended platform, never forget original intention!

The main points of the safety technology of bridge erecting machine

by:Powerston     2021-04-20
, as an important mechanical equipment in the process of railway and highway construction and a large number of bridge constructions, while making great contributions to my country’s engineering industry, it also has a great safety risk due to its structural characteristics. It is a kind of special crane that is supported on the bridge structure, can change the supporting position along the longitudinal direction, and is used to install the prefabricated bridge girder at the designated position of the pier. Bridge erecting machines can generally be divided into: guide beam erecting machine, walking bridge erecting machine, walking bridge erecting machine... safety technical points. , used as railway and highway construction and A large number of important mechanical equipment in the process of bridge construction, while making great contributions to my country's engineering cause, but also due to its structural characteristics, there are great safety risks. The bridge erecting machine is a special crane that is supported on the bridge structure and can automatically change the supporting position along the longitudinal direction. It is used to install the prefabricated bridge girder at the designated position of the pier. Bridge erecting machines can generally be divided into guide beam erecting machines, walking bridge erecting machines, and walking bridge erecting machines according to the way of passing holes. Picture: Safety technical points of bridge erecting machine 1. The installation and dismantling of construction hoist belongs to a project that exceeds a certain scale and is more dangerous. A special construction plan needs to be compiled and verified by experts. 2. The assembling process is: construction preparation → placement of front outriggers, middle outriggers and lateral movement track → front outriggers, middle outriggers, rear outriggers → assembling main beams, guide beams, and installation of contact frames → before installing guide beams Outriggers → install the lifting crane → install and debug hydraulic and electronic control systems. 3. Before the installation of the bridge erecting machine, the components, accessories, tools, etc. that enter the site should be inspected and accepted in detail. 4. The size of the site and the bearing capacity of the foundation should meet the requirements for the installation and trial load of the bridge erector; the site is smooth and the longitudinal slope cannot exceed 3%. 5. Before placing the track and moving the middle outrigger horizontally, the debris on the track foundation should be cleaned up in advance. After the track is laid, the top surface elevation must be measured and leveled and cushioned. 6. Place the front and middle outriggers on the horizontally moving track. After aligning the center distance, connect the front and middle outriggers to the trolley, and use a chain hoist and cable wind rope to fix the bracket to the ground. . 7. Assemble the main beam and guide beam on the ground from the front or rear in turn, and then hoist the main beam and guide beam on one side on the outriggers with two cars, and install the other side in the same way. 8. Measure the track center distance of the two guide beams according to the installation size. Install the connection frame to connect the left and right trusses into one body. 9. The order of dismantling the bridge erecting machine is opposite to the installation sequence, namely: dismantling the electrical and hydraulic system→ dismantling the crane crane→ dismantling the front leg of the guide beam→ dismantling the connection frame and the guide beam, main beam→ dismantling the front leg and middle leg , Rear outriggers→Remove the front and middle horizontal movement rails.
It is beyond doubt that benefits building material hoist. Market sentiments are strong, especially in the light of growing construction hoist suppliers observed globally.
Boasting good reputation in the industry, Wuxi Powerston Technology Co.,Ltd is the leading suspended working platform supplier, offering high quality and suspended working platform services for homes and enterprised all over the world. More info on Powerston Construction Equipment.
To offer abundant options of product is an important factor to a company, such as suspended working platformbuilding material hoist to afford high-quality products for customers.
Wuxi Powerston Technology Co.,Ltd has an excellent staffs who will guide you with their best ideas by keeping in constant touch with your company and informing about the market trends.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...